Before ordering sand, gravel or crushed stone, you need to answer two questions: which material and fraction suits the job, and how much is needed. A wrong choice means either a poor result or needless cost. Below is a simple overview.

What a fraction means

A fraction shows the range of stone sizes in millimetres. 0/32 means the material has grains from 0 to 32 mm, that is, including the fine part. Such a mix compacts well and suits base layers, roads and yards. 16/32 or 8/16 is clean crushed stone without fines, which lets water through and suits drainage and concrete aggregate. If you are unsure, ask the designer or builder.

Sand, gravel and crushed stone

  • Sand: backfill, a bedding cushion and the layer under paving. Fine sand suits backfill and an intermediate layer.
  • Gravel: a natural material with rounded stones, suited to drainage and base layers.
  • Crushed stone: broken rock with sharp edges. The edges interlock, so crushed stone compacts stronger than rounded gravel.

How much you need

Work out the quantity like this: volume is the area multiplied by the layer thickness, then multiply by the density and divide by the payload of a trip. For example, 100 m² and a 0.2 m layer is 20 m³, and gravel at 1.6 t/m³ gives about 32 tonnes. Our grain-type semi-trailer carries up to about 26 tonnes, so that is two trips. For exact densities and worked examples see Tonnes and cubic metres. Compaction usually takes more material than the calculated volume, and it is worth allowing roughly a fifth to a third extra.

Wet and frozen material

Wet sand weighs more than dry for the same volume, so fewer cubic metres fit in a trip. Frozen material does not tip out of the trailer properly. Read Winter tipper haulage.

Unloading

When unloading with a tipper the material stays in a pile. When ordering, say:

  • where the pile will go and how much room there is;
  • whether the surface is firm and level, so a heavy truck does not sink;
  • whether there are power lines, branches or a roof overhead;
  • whether unloading happens on a public road. In that case check the local authority’s requirements.

What to include in the request

  1. Material and fraction (if you know it).
  2. Quantity in tonnes or cubic metres.
  3. Loading point and unloading point.
  4. Date and time.
  5. Whether the material is wet or frozen.
  6. Unloading place and access.